Details: tarring 3.7:removal of unsuitable soil with disposal upto 1000 m removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per clause 303.5.2 as per technical specification clause 302.3.11 od496205/2024-2025:filling up holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm brocken stone and compacting with power roller to get a compact surface. 75.5.2.2pb:tack coat - with packed bitumen rates providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with hydraulic broom as per technical specification clause 503. 75.5.11.1.a.2pb:mix seal surfacing - manual means - type a - bitumen s-65 - packed bitumen rates providing
Sector: RDPR