Details: pond side protection in ward 15 od535408/2024-2025:desilting thodu using hydraulic excavator (clearing debris and silt from thodu) depositing at the banks etc complete 50.2.3.1:pumping or bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete 2.6.1:earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.all kinds of soil od542359/2024-2025:dry rubble masonry _ dry rubble without concrete levelling course masonry with goodquality blasted rubble including packing to compactness to lines and levels cost and conveyanceof all materials labour charges etc. complete as per direction of departmental officers at site 4.3.1:centering and shuttering including strutting, propping etc. and removal of
Sector: RDPR