Details: side protection 2.6.1:earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.all kinds of soil 2.18.2:close timbering over areas including strutting, shoring and packing cavities (wherever required) etc. complete ( measurements to be taken of the face area timbered):depth exceeding 1.5 m but exceeding 3 m 60.1.1:ring bund type-i-putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete. 60.2.2:bailing out water using 5hp pump- bailing out water with 5hp engine and pump set including conveyance to site an
Sector: Irrigation