Details: appendix a - construction of canal 2.31:clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared od37789/2024-2025:earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, for all lead and lifts, disposed earth to be levelled and neatly dressed.all kinds of soil od37790/2024-2025:earth work in excavation by mechanical means (hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all lead and lifts, disposed earth to be levelled and neatly dressed. hard rock (blasting prohibited) od37791/2024-2025:filling available excavated earth (excluding rock) in trenches
Sector: Irrigation