Details: road concreting, retarring and berm concreting od313789/2024-2025:surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of , lead up to 50 m and lift up to 1.5 m., all kinds of soil 75.8.1.1.a:providing plain cement concrete for wearing coat cc 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required as required including compaction, finishingand tamping etc .complete. max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification(i) nominal mix (1:2:4) od313788/2024-2025: scarifying existing bituminous surface to a depth of 150 mm by mechanical means - scarifying the existing bituminous road surface to a depth of 150 mm and recompacting- the aggregate received from scarifying, with static roller 75.8.1:providing plain cement concrete for road work cc 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required and camber in panels (@ 3 m c/c) as requ
Sector: RDPR