Details: construction of side protection wall 2.31:clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared od11665/2023-2024:putting up ring bund and bailing out water during the course of construction by engaging man coolies andremoving the bund after the completion of work as directed by the departmental officers at site od39356/2024-2025:excavation for removal of accumulated or deposited silt ,clay,mud etc in or under water from the thodu by mechanical means or manual means with all lead and lift including disposal of the removed earth,silt,clay,mud etc , complete as per the directions of the engineer in charge for fulfilling the final objective of removing all obstructions and to ensure free flow of water in the thodu, and convenyance /carriage charge for /silt collected from site to contractors own dum
Sector: Irrigation