Details: construction of toilet 6.3.2:brick work with common burnt clay machine moulded perforated bricks of classdesignation 12.5 conforming to is: 2222 in superstructure above plinth level up tofloor five level in cement mortar 1:6 (1 cement : 6 coarse sand):with modular bricks 5.3:reinforced cement concrete work in beams, suspended floors, roofs, having up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (zone iii) : 3 graded stone aggregate 20 mm nominal size). 5.9.3:centering and shuttering including strutting, etc. and removal of form for:suspended floors, roofs, landings, balconies and access platform 5.22.6:steel reinforcement for r.c.c work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelthermo - mechanically treated bars of g
Sector: Irrigation