Details: karippur aalparamb road drainage renovation od449112/2024-2025:od from 2.6.1 -earth work in excavation by mechanical means (hydraulic excavator)/manualmeans over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to belevelled and neatly dressed.all classes of soil od449102/2024-2025:filling with quarry muckfilling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the cbr value of subgrade od449100/2024-2025:providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 <br> i. p.c.c grade m 10 <br> (i) nominal mix 1:3:6 11.4.2.1:providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specification
Sector: RDPR