Details: appendix a od214331/2024-2025:cleaning the filled up man holes including removing the cover slab and removing the filledup materials and conveying the same and taking pits for disposal of the same taking pits , and covered the pitswith earth etc. complete within a distance of 150m etc od214342/2024-2025:constructing sewer manhole of size 80x80cm inside and depth not exceeding of 60 cm with 20cm thick cement concrete side walls using 1:2:4 using 20mm b.s. and c.c 1:4:8 10cm thick using 40 mm broken stone for bottom and plastering inside with 1:3, 12mm two coat and forming channel with c.c 1:2:4 , 20mm broken stone and providing r.c.c cover slab 160x 160x7.5 cm using 20mm broken stone using reinforcement 7kg (approx) etc. complete as per standard specification. od214337/2024-2025:cleaning edge drain including removing cover slab and deposited silt and re fixing the cover slab in position 15.56:dismantling old plaster or skirting raking out joints and cleaning the surface for plaster incl
Sector: PWD