Details: side wall od124940/2024-2025:modified 60.7.3. dismantling dr - dismanling , clearing away and carefully stackingmaterials useful for reuse for any thickness of walls in dr masonry including disposal of debriswithin a distance of 150m. 2.8.1:earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kinds of soil od124947/2024-2025:modified 60.7.1. dry rubble masonry _ dry rubble without concrete levelling coursemasonry with good quality blasted rubble including packing to compactness to lines and levelscost and conveyance of all materials labour charges etc. complete as per direction ofdepartmental officers at site od124948/2024-2025:modified 60.7.8. dr with departmental. stone - dry rubble masonr
Sector: RDPR