Details: side protection for thodu 2.8.1:earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kinds of soil od510990/2024-2025:modified 60.7.1]dry rubble masonry-dry rubble without concrete levelling coursemasonry with good quality blasted rubble including packing to compactness to lines and levelscost and conveyance of all materials,labour charges etc complete as per direction ofdepartmental officers at site. 4.1.3:providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-iii) : 4 graded stone aggregate 20 mm nominal size) 4.3.1:centering and shuttering including strutting, prop
Sector: RDPR