Details: bund formation od32500/2024-2025:bund formation with conveyed earth: earth work in rough excavation, conveying usingcountry boat, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods,rolling each layer with 1/2 tonne roller or wooden or steel rammers, and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead up to 2 km and lift up to 1.5 m:all kinds of soil
Sector: Irrigation