Details: road work 2.1:clearing grass and removal of clearing grass and removal of up to a distance of 30m outside the periphery of the area as per technical specification clause 201. by manual means od3442/2024-2025:engaging hydraulic excavator of 1 bucket including driver and fuel 3.2:preparation of foundation for embankment scarifying existing bituminous surface to a depth of 150 mm by mechanical means scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4. od3708/2024-2025:filling with quarry muckfilling up low lying and water logged areas with local material/quarry muck , spreading in layers ,leveling the top at site and consolidation by ramming , etc complete for improving the cbr value of subgrade 11.4.1.1:providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 120
Sector: Harbor