Details: 1 appendix:a-construction of ranny valiya bridge 12.1.b.1:earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. ordinary soil - depth upto 3m - mechanical means 12.25.6:bored cast-in-situ m35 grade r.c.c. pile using concrete mixer excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. pile diameter-1200 mm od73065/2024-2025:fabricating,conveying and driving of 1200 mm dia m.s liner with 6mm thick down to the required depth in line and level with out damaging the m.s linerincluding liner charge and conveying of all materials machinery and labour charge. 12.40:supply, fitting and placing un- coated hysd bar reinforcement in foundation complete as per drawing and technical specific
Sector: Road development