Details: road 11.1.1.1:excavation for structures <br> earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> i. ordinary soil <br> (i) upto 3 m depth 3.5.2:excavation in soil with dozer with lead upto 100 m <br> excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. 11.4.1.1:providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 <br> i. p.c.c grade m 10 <br> (i) nominal mix 1:3:6 11.4.2.2:prov
Sector: RDPR