Details: pond and pipeline works 2.6.1:earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.all kinds of soil 2.26.1:extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.all kinds of soil od515582/2024-2025:dry rubble masonry _ dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of departmental officers at site 7.1.1:random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:cement mortar 1:6
Sector: RDPR