Details: culvert construction od280334/2024-2025:putting up ring bund (type 2) with earth filled gunny bags of top width 1m, bottom width 2m height 2m side and filling in between with earth to form ring bund and maintaining the same leak proof till completion of the work and clearing the site by dismantling of the bund after completion of the work etc complete. od282392/2024-2025:bailing out water using 2hp pump -bailing out water with 2hp engine and pump setincluding conveyance to site and , cost of fuel, lubrication and other stores,pay to staff etc complete 11.1.1.1:excavation for structures earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. i. ordinary soil (i) upto 3 m depth 11.1.4:excavation for structures eart
Sector: RDPR