Details: rennovation work 2.6.1:earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.all kinds of soil od455343/2024-2025:dismantling laterite masonry - dismantling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in laterite masonry in cement mortar disposal of debris within a distance of 150m. 4.3.1:centering and shuttering including strutting, propping etc. and removal of form work for:foundations, footings, bases for columns 4.1.3:providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-iii) : 4 graded stone aggregate 20 mm nominal size) od475395/2024-2025:(copy from dar 50.6.7.1) laterate masonry
Sector: RDPR