Details: dsr 2018 2.8.1:earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kinds of soil 50.6.1.1:solid block masonry using pre cast solid blocks ( factory made) of size 40x20x20cm or nearest available size confirming to is 2185 part 1 of 1979 for foundation and plinth with thickness 20 cm and above in: cm 1:6 ( 1 cement : 6 coarse sand) etc complete 10.25.2:item shifted to sub head 14 as item 14.73item shifted to head 14 as item 14.74steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.in gratings, frames, guard bar, ladder, railings, brackets, gates and simil
Sector: RDPR