Details: side protection od516232/2024-2025:earth work in excavation by mechanical means (hydraulic excavator)/ manual means in foundation trenches or drains ( not exceeding 1.50 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.50 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kinds of soil 11.4.1.1:providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 <br> i. p.c.c grade m 10 <br> (i) nominal mix 1:3:6 od516236/2024-2025:dry rubble masonry - dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of departmental officers at site 11.4.3.1:providing concrete for plain/reinforced concrete in open found
Sector: RDPR