Details: maintenanace 15.23.1:dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.for thickness of tiles 10 mm to 25 mm 15.13.1:taking out doors, windows and clerestory window shutters (steel or wood ) including stacking within 50 metres lead:of area 3 sq. metes and below 2.8.1:earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kinds of soil od385694/2024-2025:dry rubble masonry _ dry rubble masonry - dry rubble masonry with good quality blasted rubble includingconveyence of material and labour charges etc. complete as per direction of departmental officers at sitemodified 60.7.1 5.1.2:providing and laying in position specified grade of
Sector: RDPR