Details: road construction 3.5.2:excavation in soil with dozer with lead upto 100 m excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. od321206/2024-2025:[od from dar 60.7.1] - dry rubble masonry _ dry rubble without concrete levellingcourse masonry with good quality blasted rubble including packing to compactness to lines andlevels cost and conveyance of all materials labour charges etc. complete as per direction ofdepartmental officers at site 11.4.4:providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 iv. r.c.c grade m 20 od321208/2024-2025: filling with contractors own earth (excluding rock) in open areas in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and wate
Sector: RDPR