Details: concreting 3.5.2:excavation in soil with dozer with lead upto 100 m <br> excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. od500989/2024-2025: dry rubble masonry with hard stone in foundation and superstructure including paking to compactness to lines and levels cost and conveyance of all materials labour charges etc complete as per approved drawing and relevent technical specifications od453470/2024-2025:filling with contractors own earth (excluding rock) in open areas in layers not exceeding 20cm in depth , consolidating each deposited layer by ramming and watering ,lead up to 50m and lift up to 1.50m as per the direction of site engineer in charge (modified mord3.3&amp;3.4) od366398/2024-2025: (od from dar 51.2.3 )filling with quarry muckfilling up low lying and water logge
Sector: RDPR