Details: road construction od463236/2024-2025:filling with contractors own earth (excluding rock) in open areas in layers not exceeding 20cm in depth , consolidating each deposited layer by ramming and watering ,lead up to 50m and lift up to 1.50m as per the direction of site engineer in charge (modified mord3.3&3.4) od463238/2024-2025:filling with quarry muckfilling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the cbr value of subgrade od463237/2024-2025:providing plain cement concrete for road work cc 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification(i) nominal mix (1:2:4) od463241/2024-2025:providing and fixing granite of any col
Sector: RDPR