Details: maintenance work of road 2.14.2.a:dismantling of flexible pavements<br> dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per technical specification clause 202 <br> (ii) by mechanical means<br> (a) bituminous courses 3.2:preparation of foundation for embankment <br> scarifying existing bituminous surface to a depth of 150 mm by mechanical means <br> scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4. od501618/2024-2025:granular sub-base/base/surface course with scarified materials (table 400.13) by mix in place method normal. construction of granular sub-base by providing scarified material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and co
Sector: RDPR