Details: retaining wall 2.7.d:dismantling stone masonry as per technical specification clause 202.<br> dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per technical specification clause 202.<br> (d) dry rubble masonry 3.5.1:excavation in cutting in soil by manual means with lead upto 50 m <br> excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3 od439706/2024-2025:dr with departmental. stone -dry rubble masonry _ dry rubble without concrete levelling course using departmental rubble includingpacking to compactness to lines and levels, labour charges etc. complete as per direction of departmentalofficers at site od439707/2024-2025:dry rubble masonry- dry rubble
Sector: RDPR