Details: bm&bc tarring 55.4:supplying and stacking 36mm size hard broken stone in standard heaps for measurement. 55.8.a:filling up holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. 3.15:scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by mechanical means 4.1.a.1:construction of granular sub-base by providing graded material, mixing in a mechanical mix plant at omc, carriage of mixed material to work site, spreading in uniform layers with a motor grader on the prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 grading-i - plant mix method 4.12:providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including
Sector: RDPR