Details: pond protection od477893/2024-2025:bailing out water using 5hp pump -bailing out water with 5hp engine and pump set includingconveyance to site and ,cost of fuel, lubrication oil and other stores,pay of staffetc..complete . 2.8.1:earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kinds of soil od477715/2024-2025:dry rubble masonry -dry rubble with out concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc..complete as per direction of departmental officers at site . 5.9.5:centering and shuttering including strutting, etc. and removal of form for:lintels, beams, plint
Sector: RDPR