Details: culvert od524210/2024-2025:bailing out water using 5hp pump- bailing out water with 5hp engine and pump set includingconveyance to site and ,cost of fuel, lubrication oil and other stores, pay of staff etccomplete 11.1.1.1:excavation for structures <br> earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> i. ordinary soil <br> (i) upto 3 m depth 14.8:providing and laying of dry rubble flooring complete as per drawings and technical specifications clause 1303.3 75.7.1:dry rubble masonry with hard stone, including through/bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per a
Sector: RDPR