Details: drain 11.1.1.1:excavation for structures <br> earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> i. ordinary soil <br> (i) upto 3 m depth od531101/2024-2025:providing concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specifications clause 802,803,1202&12031.p.c.c grade m10(i)nominal mix 1:3:6 without formwork 12.5.3:plain/reinforced cement concrete in substructure complete as per drawings and technical specification clauses 802, 804, 805, 806, 807, 1202 ans 1204<br> for height upto 5 m <br> iii. r.c.c grade m 20 13.1.2:providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications
Sector: RDPR