Description: Pro No 195 LAYING CONCRETE PIPE NEAR AYURVEDA HOSPITAL IN WARD 5 ELANJI GP Work Name Annual Plan PRO NO 195 25 LAYING CONCRETE PIPE NEAR AYURVEDA HOSPITAL IN WARD 5 ELANJI GP OWN FUND General Civil Work
Details: CONCRETE PIPE LAYING 9.3.C:Providing and Laying Reinforced Cement Concrete pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.(C) 750 mm dia 3.5.2:Excavation in Soil with Dozer with lead upto 100 m Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6 OD343447/2024-2025:DRY RUBBLE MASONRY _ Dry rubble without conc
Sector: RDPR