Details: maintenance 14.43:removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. 14.1.1:repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of to the dumping ground within 50 meters lead:with cement mortar 1:4 ( 1 cement : fine sand) 14.53.1:wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:one or more coats on old work 14.54.1:painting with synthetic enamel paint of approved brand and manufacture of required colour to an give even shade:one or more coats on old work od514968/2024-2025:engauging labour od516300/2024-2025:roofing with g.i hard colour powder coated traffod sheets 0.35 mm thick or nearest available thickness with overlaps of 150mm at the ends and gi hook o
Sector: RDPR