Details: road reconcreting 3.5.2:excavation in soil with dozer with lead upto 100 m <br> excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. od490903/2024-2025:filling with quarry muck - filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the cbr value of subgrade od490907/2024-2025:providing plain cement concrete for road work cc 1:2:4 (1 cement: 2 fine aggregate: 4 course aggregate) laid to required and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc. complete. max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) nominal mix (1:2:4) road retarring 3.5.2:excavation i
Sector: RDPR