Description: CONSTRUCTION OF THOOMBOORMOZHI MODEL BIOCOMPOST BIN FOR VARIOUS GOVT AIDED SCHOOLS IN CHITHARA GRAMA PANCHAYAT 300 25 Work Name Annual Plan Chithara GP 2024 25 CONSTRUCTION OF THOOMBOORMOZHI MODEL BIOCOMPOST BIN FOR VARIOUS GOVT AIDED SCHOOLS IN CHITHARA GRAMA PANCHAYAT SO 300 25 CONSTRUCTION OF THOOMBOORMOZHI MODEL BIOCOMPOST BIN FOR VARIOUS GOVT AIDED SCHOOLS IN CHITHARA GRAMA PANCHAYAT SO 300 25 General Civil Work
Details: aerobic compost unit shed 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil 50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of ce
Sector: RDPR