Details: maintenance 15.3:demolishing r.c.c. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of engineer -in-charge. 15.7.1:demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge.in mud mortar 15.23.1:dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.for thickness of tiles 10 mm to 25 mm 2.8.1:earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kinds of soil 50.6.2.1:solid block masonry using pre c
Sector: RDPR