Details: road concrete 3.15.2:compacting original ground<br> (ii) compacting original ground supporting subgrade<br> loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of tables 300.1 and 300.2 for subgrade construction as per technical specification clause 303.5.2. 75.8.1:providing plain cement concrete for road work cc 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification(i) nominal mix (1:2:4) 3.14:construction of subgrade and earthen shoulders<br> construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacted to meet requirement of table 300.
Sector: RDPR