Details: building maintenance 15.28.2:dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :asbestos sheet 15.19:dismantling steel work manually / by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per directions of engineer -in-charge. 5.2.2:reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) 5.9.6:centering and shuttering including strutting, etc. and removal of form for:columns, pillars, piers, abutments, posts and struts 5.22.6:steel reinforcement for r.c.c work including straightening, cutting, bending, placing in position and binding all complete upto plinth l
Sector: RDPR