Details: road work 3.2:preparation of foundation for embankment scarifying existing bituminous surface to a depth of 150 mm by mechanical means scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4. od284152/2024-2025:sectioning up to 150mm and forming the surface for old road way levelling,cambering etc complete as per direction of engineer in charge od284133/2024-2025:providing and laying of interlocking concrete block pavements using 80 mm m40 hydraulic blocks of approved size, design & shape, laid in required pattern over and including a compacted bed of 6mm stone aggregate of 50mm average thickness, etc. all complete as per the direction of engineerin-charge 75.8.1.1.a:providing plain cement concrete for wearing coat cc 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required as required including compaction, finishingand tamping etc
Sector: RDPR