Details: side protection 15.9.2:demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer -in- charges:in cement mortar 2.8.1:earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kinds of soil od498270/2024-2025: rr -with departmental stone -random rubble masonry with hard stone in foundation and plinth including levelling up withcement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominalsize) up to plinth level with:cement mortar 1:6 (1 cement : 6 coarse sand) od467760/2024-2025:random rubble masonry with hard stone in foundation an
Sector: RDPR