Details: kummanatt anganwady road construction 2nd stage 3.1:preparation of foundation for embankment <br> scarifying existing granular surface to a depth of 50 mm by manual means<br> scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per technical specification clause 301.4. od512220/2024-2025:filling with quarry muckfilling up low lying and water logged areas with local material/ quarry muck, spreading in layers, levelingthe top at site and consolidation by ramming, etc complete for improving the cbr value of subgrade od512219/2024-2025:providing plain cement concrete for road work cc 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc .complete. max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) nominal mix (1:2:4) od512
Sector: RDPR