Details: side protection work (dr) 3.6:excavation in marshy soil <br> excavation for roadway in marshy soil with hydraulic excavator 0.9 bucket capacity including cutting and loading in tippers and disposal with a lift upto 1.5 m and lead upto 1000 m, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per technical specification clause 302.3.6. od142020/2024-2025:dry rubble masonry _ dry rubble without concrete leveling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labor charges etc. complete as per direction of departmental officers at site. 12.7:supplying, fitting and placing tmt bar reinforcement (fe 415) in substructure complete as per drawings and technical specification clauses 1002, 1005, 1010 & 1202 od142022/2024-2025:providing concrete for reinforced concrete in middle belt for dr retaining walls complete as per drawing and directio
Sector: RDPR