Details: concreting od520492/2024-2025:scarifying existing road surface to a depth of 150mm and compacting the aggregates obtainedfrom scarifying with power roller, as per direction of departmental officials at site od520493/2024-2025:surface dressing of the ground including removing vegetation and in equalities not exceeding15cm deep and disposal of lead up to 50m and lift up to 1.5m . all kinds of soil 75.8.1:providing plain cement concrete for road work cc 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification(i) nominal mix (1:2:4)
Sector: RDPR