Details: well construction 2.6.1:earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.all kinds of soil 2.26.1:extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.all kinds of soil od521803/2024-2025:-sinking well in all classes of soil except hard rock which requires blasting to line and levels and plumb by scooping od521804/2024-2025:dry rubble masonry _ dry rubble without concrete levelling course masonrywith good quality blasted rubble including packing to compactness to lines and levelscost and conveyance of all materials labour charges etc. complete as per direction ofdepartmental officers at site 4.1.3:providing and laying in position cement concrete of specified grade excluding the cost of centering a
Sector: RDPR