Details: retarring 3.5.3:excavation in soil using hydraulic excavator and tippers with disposal upto 1000 m excavation for roadwork in soil with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per technical specification clause 302.3 2.14.2.a:dismantling of flexible pavements<br> dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per technical specification clause 202 <br> (ii) by mechanical means<br> (a) bituminous courses 4.11.2:granular sub-base/base/surface course with local materials (table 400.13) by mix in place method normal. construction of granular sub-base by providing local material spreading in uniform layers with motor grader on p
Sector: RDPR