Details: road maintenance 2.5.1.b:dismantling of structures<br> dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including t&p and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per technical specification clause 202.<br> (i) by manual means <br> (b) cement concrete 3.5.1:excavation in cutting in soil by manual means with lead upto 50 m <br> excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3 od513748/2024-2025:filling with quarry muck-filling up low lying areas with local material/quarry muck, spreading in layers levelling the top at site and consolidating by ramming etc.complete 11.4.1.1:providing concrete
Sector: RDPR