Details: vcb maintenance 10.25.2:item shifted to sub head 14 as item 14.73item shifted to head 14 as item 14.74steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.in gratings, frames, guard bar, ladder, railings, brackets, gates and similar works 4.1.3:providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-iii) : 4 graded stone aggregate 20 mm nominal size) 14.1.2:repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of to the dumping ground within 50 meters lead:cement mortar 1:4 ( 1 cement: 4 coarse sand)
Sector: RDPR