Details: road formation 3.5.2:excavation in soil with dozer with lead upto 100 m excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. od280803/2024-2025:dry rubble masonry _ dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of departmental officers at site 11.4.3.1:providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203iii. p.c.c. grade m 20 (i) nominal mix (1:2:4) 3.14:construction of subgrade and earthen shoulders construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, t
Sector: RDPR