Details: road work 3.6:excavation for roadwork in soil with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m 3.19.1:loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of table 300-2 for compacting original ground supporting sub-grade construction. 4.1.a.1:construction of granular sub-base by providing graded material, mixing in a mechanical mix plant at omc, carriage of mixed material to work site, spreading in uniform layers with a motor grader on the prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 grading-i - plant mix method 4.12:providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specifica
Sector: PWD