Details: construction of septic tank 15.3:demolishing r.c.c. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of engineer -in-charge. 51.19.st2:supplying and installing ready made pvc septic tank including the cost of carriage, trenching, placing at the level below ground level as specified as per the direction of engineer in charge (provision for cc/rcc/sand/06mm aggregate for the preparation of bed shall be paid separately) 2. 15 to below 25 flush capacity 2.8.1:earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kinds of soil 5.3:reinforced cement concrete work in beams, suspended floors, roofs, hav
Sector: RDPR