Details: road concrete od449523/2024-2025:filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering ,lead up to 50m and lift up to 1.5m as per direction of site engineer-in charge od409276/2024-2025:surface dressing of the ground in all kinds of soil including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of , lead up to 50 m and lift up to 1.5 m. 75.8.1:providing plain cement concrete for road work cc 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification(i) nominal mix (1:2:4) 75.8.1.1:providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications clause 8
Sector: RDPR